Our website uses cookies. A cookie is a small text file which will be saved on your computer or mobile device when you visit our website. More information? Read our cookie policy.
inscription: ‘Two streams piping. Gravel is washed into the deep bedrock cut which leads to the tunnel seen in background, right hand side of picture. This tunnel/ is three thousand feet long, and was driven to get outlet for tailings.’
Purchased with the support of the Mondriaan Stichting, the Prins Bernhard Cultuurfonds, the VSBfonds, the Paul Huf Fonds/Rijksmuseum Fonds and the Egbert Kunstfonds